五月天婷婷丁香综合国产_自拍主播第一页_一级片内射视频播放下载_亚洲自成人综合网_国产一区二区不卡在线看_热码AV在线中文字妞妞色_内裤被涂满了强烈春药_黄色毛片观看互动交流_色播激情五月_伊人久久精品国产午夜

+86 21 63869001 anew@anewglobal.net

Soil and Groundwater Contamination Risk Assessment

Soil and Groundwater Contamination Risk Assessment

The Client planned to construct a police station on land that was used by a factory manufacturing pesticides. Due to the nature of manufacturing pesticides, both the soil and groundwater are very likely to be contaminated by leakage or spill of chemicals, processing water, and/or wastewater. To investigate whether the site was contaminated, we conducted a Phase II ESA to identify potential sources of contamination. Based on the result of site assessment, Anew professionals further developed a detailed sampling plan, which includes but is not limited to borehole locations, installation of groundwater monitoring and sampling wells, and sampling plan of groundwater and soil. Anew also conducted risk assessments of potential contamination on human health based on samples collected onsite.